after-sales and maintenance performance
|
|
no.
|
equipment name
|
business content
|
number
(stage)
|
engineering
project
|
finish time
|
function
situation
|
|
1
|
gate,hoist and electrical system
|
manufacture
, installation
|
|
pakistan
dang sa hydropower station
|
2006/10-2009/8
|
good
|
|
2
|
420/50t overhead crane
|
manufacture
, installation
|
1
|
hengyang
hunan large terminal
|
2004/6/-2004/12
|
good
|
|
3
|
arc
gate,flat gate,hoist
|
manufacture,
installation, reinforcement
|
1,1,3
|
fengjiashan
reservoir
|
2005/2-2005/6
|
good
|
|
4
|
arc
gate,flat gate
|
manufacture
, installation
|
5,4
|
kazakhstan
syrdarya hydropower dam project
|
2004/10-2005/3
|
good
|
|
5
|
the
metal structure of the zipingpu reservoir
|
maintenance
|
|
the
zipingpu hydropower station
|
2007/5-2010/3
|
good
|
|
6
|
shuikou
2*500kn draft tube one way gantry crane
|
transformation
|
1
|
fujian
hydraulic power plant
|
2009/3-2009/8
|
good
|
|
7
|
pingban
crest and draft tube gantry crane
|
manufacture
, installation
|
2
|
guangxi
ping hydropower station
|
2009/9-2009/11
|
good
|
|
8
|
2*500kn
draft tube one way gantry crane and track
|
manufacture
, installation
|
1
|
danjiangkou
hubei hydroelectric power plant
|
2003/5-2003/8
|
good
|
|
9
|
zipingba
reservoir metal structure
|
maintenance
|
|
the
zipingpu hydropower station
|
2009/11-2010/3
|
good
|
|
10
|
outlet
sand gate maintenance
|
manufacture
, installation
|
1
|
sichuan
shawan hydropower station
|
2007/5-2007/10
|
good
|
|
11
|
power
house intake trashcrack panel
|
manufacture
, installation
|
12
|
sichuan
shawan hydropower station
|
2007/7-2007/11
|
good
|
|
12
|
canal
hoist and embedded
|
installation
|
|
leshan
dongfeng weir
|
1998/3-1998/10
|
good
|
|
13
|
crest
gantry crane and draft tube trolley
|
installation
|
|
guangxi
le tan hydropower station
|
2002/4-2002/11
|
good
|
|
14
|
2000/22*400kn
two way gantry crane
|
installation
|
1
|
sichuan
ertan hydropower station
|
1998/5-1998/10
|
good
|
|
15
|
2*1250kn
gantry crane and track,floating gate
|
manufacture
, installation
|
|
gongzui
hydropower station
|
2004/2-2004/5
|
good
|
|
16
|
gate,hoist
equipment
|
manufacture
, installation
|
|
xianyang
pavilion
|
2009-
|
good
|
|
13
|
lifting gantry
crane of draft tube gate,lifting gantry crane of intake maintenance gate,the
mid outlet hole gate lifting gantry crane repair
|
maintenance
|
3
|
chongqing
jiangkou hydropower station
|
2010/4-2010/6
|
good
|
|
14
|
crest
gantry crane maintenance
|
maintenance
|
2
|
yangtze
river three gorges project
|
2008/12-2009/2
|
good
|
|
15
|
5000kn
gantry crane lifting beam cable and cable maintenance
|
maintenance
|
1
|
danjiangkou
hubei hydroelectric power plant
|
2010/3-2010/5
|
good
|
|
16
|
l
type gantry crane 2010 annual maintenance project
|
maintenance
|
1
|
le
tan hydropower plant
|
2010/4-2010/5
|
good
|