sliding gate list
|
|
no.
|
product
|
opening
(w *h) (m)
|
water head
|
q'ty
|
project
|
finish time
|
running
situation
|
|
1
|
1# ship lock emergency gate
|
34*11
|
10
|
1
|
gezhouba hpp 2nd
|
1984
|
good
|
|
2
|
emergency gate
|
7.4*11
|
75
|
1
|
qingjiang hpp
|
1992
|
good
|
|
3
|
intake
emergency gate
|
7*8
|
50
|
4
|
baozhusi hpp
|
1996
|
good
|
|
4
|
10#
sand basin sliding gate
|
9*15.027
|
100
|
1
|
gongzui hpp
|
2003
|
good
|
|
5
|
maintenance gate
|
6*10.5
|
16
|
1
|
tibet
changdu jinhe hpp
|
2003
|
good
|
|
6
|
bottom outlet maintenance gate
|
8.34*16.67
|
110
|
2
|
guangxi
longtan hpp
|
2006
|
good
|
|
7
|
bottom
outlet sliding gate
|
6*10.99
|
146
|
2
|
xiaowan hpp in yunnan
|
2008
|
good
|
|
8
|
sliding gate
|
2.4*2.4
|
168
|
5
|
maoergai hpp
|
2011
|
good
|
|
9
|
maintenance gate
|
6*7
|
118
|
1
|
maoergai hpp
|
2011
|
good
|
|
10
|
spillway maintenance gate
|
13*12.6
|
12.1
|
1
|
xiaoshixia hpp
|
2011
|
good
|
|
11
|
draft
tube maintenance gate
|
5.405*5.037
|
17
|
4
|
xiaoshixia hpp
|
2011
|
good
|
|
12
|
diversion
tunnel inlet sliding gate
|
10*10.9
|
80.34
|
1
|
daoyekan hpp in burma
|
2011
|
good
|
|
13
|
diversion tunnel outlet emergency gate
|
5*7
|
76
|
1
|
yili hpp in china (xinjiang)
|
2011
|
good
|
|
14
|
power intake emergency gate
|
7.2*7.2
|
35
|
1
|
yili hpp in china (xinjiang)
|
2011
|
good
|
|
15
|
draft
tube maintenance gate
|
3.425*3.304
|
14.9
|
2
|
yili hpp in china (xinjiang)
|
2011
|
good
|
|
16
|
draft
tube maintenance gate
|
4.66*3.049
|
12.6
|
4
|
yili hpp in china (xinjiang)
|
2011
|
good
|
|
17
|
spillway maintenance gate
|
8*13.4
|
12.92
|
1
|
liushugou hpp in china
|
2011
|
good
|
|
18
|
spillway stoplog
|
6.2*8
|
|
1
|
ansi hpp in chile
|
2011
|
good
|
|
19
|
spillway stoplog
|
13.5*16
|
|
3
|
ansi hpp in chile
|
2011
|
good
|
|
20
|
emergency sliding gate
|
2.5*2.5
|
|
1
|
burrard hpp
|
2011
|
good
|
|
21
|
stoplog
|
5.0*7.5
|
7.5
|
|
roseries dam in sudan
|
2011
|
good
|
|
22
|
intake
maintenance gate
|
14.82*17.40
|
33.246
|
2
|
hun'an
hpp in china
|
2012
|
good
|
|
23
|
spillway maintenance gate
|
15*9.5
|
8
|
1
|
matala hpp in angola
|
2012
|
good
|
|
24
|
maintenance
gate
|
12*16
|
15
|
2
|
angu
hpp in china
|
2013
|
good
|
|
25
|
ecological
outlet emergency gate
|
9.47*3.6
|
26
|
1
|
angu
hpp in china
|
2013
|
good
|
|
26
|
spillway maintenance stoplog
|
12*44.34
|
40.4
|
1
|
neelum & jeelum hpp in pakistan
|
2014
|
manufacturing
|
|
27
|
maintenance
stoplog gate
|
9*12
|
8
|
1
|
neelum & jeelum hpp in pakistan
|
2014
|
manufacturing
|
|
28
|
1#
spillway sliding gate
|
6.2*14.4
|
29
|
2
|
lei reventazon hpp in costa rica
|
2014
|
manufacturing
|
|
29
|
1#
spillway sliding gate
|
6.2*14.4
|
78
|
2
|
costa
rica lei reventazon hydropower project
|
2014
|
manufacturing
|
|
30
|
3&4
intake stoplog
|
7*20.5
|
57
|
20
|
tarbela 4th extension in pakistan
|
2014
|
manufacturing
|
|
31
|
spillway
maintenance gate
|
13.15*18
|
17.5
|
1
|
costa
rica lei reventazon hydropower project
|
2014
|
manufacturing
|
|
32
|
spillway stoplog
|
11.368*2.33
|
40.5
|
10
|
muskrat hpp in canda
|
2015
|
manufacturing
|
|
33
|
sand
basin maintenance gate
|
4.3*4.3
|
89
|
1
|
costa
rica lei reventazon hydropower project
|
2015
|
manufacturing
|
|
34
|
power intake sliding gate
|
4.5*10.5
|
4
|
3
|
carabeli hpp in china (xinjiang)
|
2015
|
manufacturing
|
|
|
|
miter gate list
|
|
no.
|
product
|
size (m)
(w * h-water head)
|
q'ty (set)
|
project
|
delivery
|
running situation
|
remark
|
|
1
|
miter gate of ship lock (upstream)
|
18*18-17.5
|
2
|
jiangxi wanan
hydropower station
|
1986
|
good
|
|
|
2
|
miter gate of ship lock (downstream)
|
18*36-34
|
2
|
jiangxi wanan
hydropower station
|
1986
|
good
|
|
|
3
|
miter gate of ship lock (upper part)
|
12*19.1-18.7
|
2
|
fujian shuikou
hydropower station
|
1992
|
good
|
|
|
4
|
miter gate of ship lock (upper part)
|
8*11-4.5
|
2
|
sichuan wulidian
hydropower station
|
1989
|
good
|
|
|
5
|
miter gate of lower
part ship lock
|
8*17.3-14.65
|
2
|
sichuan wulidian
hydropower station
|
1989
|
good
|
|
|
6
|
miter gate of upper
part ship lock
|
8*11-4.5
|
2
|
sichuan luosichi
hydropower station
|
1988
|
good
|
|
|
7
|
miter gate of lower
part ship lock
|
8*17.3-14.65
|
2
|
sichuan luosichi
hydropower station
|
1988
|
good
|
|
|
8
|
| ship lock miter
gate |
|
6*6.4-6.4
|
2
|
thailand pak phanang project
|
1998
|
good
|
|
|
9
|
|| ship lock miter
gate ||
|
6*5.9-5.9
|
2
|
thailand pak phanang project
|
1998
|
good
|
|
|
10
|
miter gate of upper
part ship lock
|
12*6.4-6
|
2
|
hongjiang hydropower
station in hunan
|
2000
|
good
|
|
|
11
|
miter gate of middle
part miter gate
|
12*17.6-17
|
2
|
hongjiang hydropower
station in hunan
|
2000
|
good
|
|
|
12
|
miter gate of lower
part ship lock
|
12*18.2-17.8
|
2
|
hongjiang hydropower
station in hunan
|
2000
|
good
|
|
|
13
|
miter gate of lower
part ship lock
|
18*17.56-10.06
|
1
|
taoyuan hunan
hydropower station
|
2012
|
good
|
|
|
|
|
chain roller gate list
|
|
no.
|
product
|
opening
(w * h) (m)
|
water head (m)
|
q'ty
|
project
|
finish time
|
running situation
|
|
1
|
sand
flushing in left bank of bottom outlet
|
5*6
|
98
|
1 set
|
manwan power station
|
1991
|
good
|
|
2
|
emergency gate of bottom outlet
|
4*9.2
|
80
|
1 set
|
bzozhusi power
station
|
1995
|
good
|
|
3
|
emergency gate of bottom outlet
|
4*8
|
60
|
1 set
|
bzozhusi power
station
|
1995
|
good
|
|
4
|
emergency gate
|
7*9
|
123.78
|
1 set
|
pubugou hydropower
station
|
2008
|
good
|