trash rack list
|
|
no.
|
product name
|
specifications
(width * height-water head)
|
number
|
project
|
date of
delivery
|
runningsi
tuation
|
|
1
|
intake
trashcrack
|
4*4
|
2
|
sichuan
tan tank kiln power station
|
1983
|
good
|
|
2
|
bottom
hole draft trashcrack
|
6*8
|
1
|
sichuan
gongzui hydropower station
|
1987
|
good
|
|
3
|
trashcrack
|
2*2.5
|
2
|
sichuan
menkanshi station
|
1987
|
good
|
|
4
|
intake
trashcrack
|
4.5*4
|
3
|
yunnan
river hydropower station
|
1987
|
good
|
|
5
|
trashcrack
|
5*28.7
|
3
|
sichuan
of jiangkou hydropower station
|
1988
|
good
|
|
6
|
intake
trashcrack
|
5*12.5
|
3
|
heizi
reservoir in xinjiang
|
1989
|
good
|
|
7
|
intake
trashcrack of power house
|
4.5*17.1
|
6
|
sichuan
screw pool power station
|
1990
|
good
|
|
8
|
intake
trashcrack
|
5.85*28.57
|
24
|
sichuan
tongjiezi power station
|
1990
|
good
|
|
9
|
intake
trashcrack
|
6*6.8
|
6
|
sichuan
wulidian shop
|
1990
|
good
|
|
10
|
intake
maintenance trashcrack
|
3.5*3.2
|
3
|
chongqing
luohuang power plant
|
1991
|
good
|
|
11
|
under
liabrary out/in take trashcrack
|
3.6*7.2-5
|
6
|
shahe
jiangsu pumped storage power station
|
2000
|
good
|
|
12
|
upper
liabrary in/out take trashcrack
|
4*9.75-5
|
4
|
shahe
jiangsu pumped storage power station
|
2000
|
good
|
|
13
|
intake
trashcrack
|
7.76*7.4-3
|
2
|
sichuan
tongzhongshui power station
|
2001
|
good
|
|
14
|
intake
trashcrack
|
7*14-3
|
5
|
sichuan
tongzhongshui power station
|
2001
|
good
|
|
15
|
intake
trashcrack
|
10.9*19.08-5
|
10
|
pakistan
gates ballotta power plant
|
2002
|
good
|
|
16
|
right
irrigation hole trashrack
|
3*4-4
|
1
|
gansu
gorge hydropower station
|
2002
|
good
|
|
17
|
the
water intake trashrack
|
2*15-5
|
2
|
tibet
changdu jinhe hydropower station
|
2003
|
good
|
|
18
|
the
water intake pare trashrack
|
2*5-3
|
1
|
tibet
changdu jinhe hydropower station
|
2003
|
good
|
|
19
|
intake
trashcrack
|
3*31.5-4
|
34
|
sichuan
zipingpu water conservancy project.
|
2004
|
good
|
|
20
|
intake
trashcrack
|
4.05*21-4
|
5
|
yunnan
longma hydropower station
|
2006
|
good
|
|
21
|
diversion
tunnel intake of the main trashrack panel
|
5*15-4
|
4
|
xinjiang
guodian chahanwusu kaidu river hydropower station
|
2007
|
good
|
|
22
|
diversion
tunnel intake of the auxiliary trashrack panel
|
5*11.745-4
|
1
|
xinjiang
guodian chahanwusu kaidu river hydropower station
|
2007
|
good
|
|
23
|
power
house intake trashcrack panel
|
5.6*40.25
|
4
|
sichuan
shawan hydropower station
|
2008
|
good
|
|
24
|
power
hole intake trashcrack
|
5*16
|
4
|
guodian
xiaoshixia hydropower station
|
2010
|
good
|
|
25
|
intake
trashcrack
|
4*18-4
|
4
|
blackwater
river sichuan maoergai hydroelectric power station
|
2010
|
good
|
|
26
|
water
diversion tunnel of the main trashrack
|
5*13.5
|
4
|
xinjiang
state power kaidu liushugou hydropower station
|
2011
|
good
|
|
27
|
ater
diversion tunnel of the auxiliary trashrack
|
5*10.157
|
1
|
xinjiang
state power kaidu liushugou hydropower station
|
2011
|
good
|
|
28
|
intake
trashcrack
|
8.5*17.3
|
2
|
burma
daoyekan level two hydropower station
|
2011
|
good
|
|
29
|
power
hole intake trashcrack
|
4*10.5
|
4
|
xinjiang
yili water power station tayi qurush
|
2011
|
good
|
|
30
|
intake
trashcrack 1 2
|
9.6*24.878
|
2
|
angostura hpp in chile
|
2011
|
good
|
|
31
|
intake trashcrack 1 3
|
7645*14774
|
1
|
angostura hpp in chile
|
2011
|
good
|
|
32
|
intake
trashcrack
|
10.35*16.5
|
4
|
pakistan
ma if pull water power station
|
2012
|
good
|
|
33
|
intake
trashcrack
|
6.3*10.8
|
2
|
pakistan
pakepatan hydropower station
|
2012
|
good
|
|
36
|
lock
the gate first conduit rack
|
14.0*14.0
|
1
|
taoyuan
hunan hydropower station
|
2012
|
good
|
|
34
|
intake
trashcrack
|
7.5*6.08
|
6
|
pakistan
- neelum & jeelum hydropower station
|
2013
|
good
|
|
35
|
bottom trashcrack
|
7.5*1.014
|
6
|
pakistan
- neelum & jeelum hydropower station
|
2013
|
good
|
|
37
|
trashcrack
|
6.54*54-4
|
12
|
engineering
angu hydropower station of dadu river
|
2013
|
good
|
|
38
|
ecological
unit plant intake trashrack panel
|
8.84*33-4
|
1
|
engineering
angu hydropower station of dadu river
|
2013
|
good
|
|
39
|
trashcrack
|
7*20.5
|
20
|
pakistan tarbela 4th extension
|
2014
|
manufacturing
|
|
40
|
power
hole intake trashcrack
|
4.5*11.5-4
|
7
|
xinjiang
carabeli water conservancy project
|
2015
|
manufacturing
|