中国水利水电夹江水工机械有限公司 trash rack-凯发真人

凯发真人
凯发真人-凯发k8娱乐官网入口
 
您现在的位置: 凯发真人-凯发k8娱乐官网入口> english> products> metal structure products
trash rack
发表时间:2015-09-10   |  来源于:本站原创  |  作者:  |  点击数:1737 

trash rrack for ghazi barotha hpp in pakistan

trash rack for water transfer conduit of taoyuan hpp in china (hunan)

trashrack  pre-assembly (pengshan base)

trash rack for heizi hpp in xinjiang of china

trash rack for angostura hpp in chile


trash rack list
no. product name specifications
(width * height-water head)
number project date of delivery runningsi tuation
1 intake trashcrack 4*4 2 sichuan tan tank kiln power station 1983 good
2 bottom hole draft trashcrack 6*8 1 sichuan gongzui hydropower station 1987 good
3 trashcrack 2*2.5 2 sichuan menkanshi station 1987 good
4 intake trashcrack 4.5*4 3 yunnan river hydropower station 1987 good
5 trashcrack 5*28.7 3 sichuan of jiangkou hydropower station 1988 good
6 intake trashcrack 5*12.5 3 heizi reservoir in xinjiang 1989 good
7 intake trashcrack of power house 4.5*17.1 6 sichuan screw pool power station 1990 good
8 intake trashcrack 5.85*28.57 24 sichuan tongjiezi power station 1990 good
9 intake trashcrack 6*6.8 6 sichuan wulidian shop 1990 good
10 intake maintenance trashcrack 3.5*3.2 3 chongqing luohuang power plant 1991 good
11 under liabrary out/in take trashcrack 3.6*7.2-5 6 shahe jiangsu pumped storage power station 2000 good
12 upper liabrary in/out take trashcrack 4*9.75-5 4 shahe jiangsu pumped storage power station 2000 good
13 intake trashcrack 7.76*7.4-3 2 sichuan tongzhongshui power station 2001 good
14 intake trashcrack 7*14-3 5 sichuan tongzhongshui power station 2001 good
15 intake trashcrack 10.9*19.08-5 10 pakistan gates ballotta power plant 2002 good
16 right irrigation hole trashrack 3*4-4 1 gansu gorge hydropower station 2002 good
17 the water intake trashrack 2*15-5 2 tibet changdu jinhe hydropower station 2003 good
18 the water intake pare trashrack 2*5-3 1 tibet changdu jinhe hydropower station 2003 good
19 intake trashcrack 3*31.5-4 34 sichuan zipingpu water conservancy project. 2004 good
20 intake trashcrack 4.05*21-4 5 yunnan longma hydropower station 2006 good
21 diversion tunnel intake of the main trashrack panel 5*15-4 4 xinjiang guodian chahanwusu kaidu river hydropower station 2007 good
22 diversion tunnel intake of the auxiliary trashrack panel 5*11.745-4 1 xinjiang guodian chahanwusu kaidu river hydropower station 2007 good
23 power house intake trashcrack panel 5.6*40.25 4 sichuan shawan hydropower station 2008 good
24 power hole intake trashcrack 5*16 4 guodian xiaoshixia hydropower station 2010 good
25 intake trashcrack 4*18-4 4 blackwater river sichuan maoergai hydroelectric power station 2010 good
26 water diversion tunnel of the main trashrack 5*13.5 4 xinjiang state power kaidu liushugou hydropower station 2011 good
27 ater diversion tunnel of the auxiliary trashrack 5*10.157 1 xinjiang state power kaidu liushugou hydropower station 2011 good
28 intake trashcrack 8.5*17.3 2 burma daoyekan level two hydropower station 2011 good
29 power hole intake trashcrack 4*10.5 4 xinjiang yili water power station tayi qurush 2011 good
30 intake trashcrack 1 2 9.6*24.878 2 angostura hpp in chile 2011 good
31 intake trashcrack 1 3 7645*14774 1 angostura hpp in chile 2011 good
32 intake trashcrack 10.35*16.5 4 pakistan ma if pull water power station 2012 good
33 intake trashcrack 6.3*10.8 2 pakistan pakepatan hydropower station 2012 good
36 lock the gate first conduit rack 14.0*14.0 1 taoyuan hunan hydropower station 2012 good
34 intake trashcrack 7.5*6.08 6 pakistan - neelum & jeelum hydropower station 2013 good
35 bottom trashcrack 7.5*1.014 6 pakistan - neelum & jeelum hydropower station 2013 good
37 trashcrack 6.54*54-4 12 engineering angu hydropower station of dadu river 2013 good
38 ecological unit plant intake trashrack panel 8.84*33-4 1 engineering angu hydropower station of dadu river 2013 good
39 trashcrack 7*20.5 20 pakistan tarbela 4th extension 2014 manufacturing
40 power hole intake trashcrack 4.5*11.5-4 7 xinjiang carabeli water conservancy project 2015 manufacturing
  地址:中国·四川夹江县西河路40号 邮编:614100 投稿邮箱:jhmw@sina.com 网站管理信箱:jhmw@sina.com
凯发真人的技术支持:中国水利水电夹江水工机械有限公司信息中心 新闻维护:中国水利水电夹江水工机械有限公司  
中国水利水电夹江水工机械有限公司 凯发真人的版权所有
网站地图