list of overhead cranes
|
|
no.
|
product
|
span (m)
|
span (m)
|
q'ty
|
project
|
finishtiame
|
|
1
|
2*32t overhead crane
|
45/15
|
19
|
1
|
jiangxi
wanan hydropower station
|
1986
|
|
2
|
100/20t overhead crane
|
20/22
|
16
|
1
|
gong
mouth hydropower station in sichuan province
|
1994
|
|
3
|
300/80/10t overhead crane
|
23/28/30
|
21
|
2
|
sichuan
province at baozhusi hydropower station
|
1995
|
|
4
|
100/20t
overhead crane
|
45/55
|
22.5
|
1
|
guangxi
natural bridge hydropower station
|
1997
|
|
5
|
100/20t overhead crane
|
15/15.5
|
6
|
1
|
iran
maschede soliman hydropower station
|
1999
|
|
6
|
325/80/10t overhead crane
|
30/40
|
16.8
|
1
|
iran
maschede soliman hydropower station
|
1999
|
|
7
|
125/32t overhead crane
|
16/22
|
17
|
1
|
sichuan
tongzhong hydropower station
|
2000
|
|
8
|
320 320/80/10t overhead crane
|
28/45/48
|
21
|
1
|
wujiang
guizhou expansion project
|
2002
|
|
9
|
160/50/10t overhead crane
|
33/33/42
|
18.7
|
1
|
qinghai
water power station
|
2002
|
|
10
|
350 350/80/10 10toverhead crane
|
26/26/40
|
21
|
1
|
guizhou
cable wind power station
|
2003
|
|
11
|
200 200/50/10 10t
overhead crane
|
30/30/35
|
22.5
|
1
|
inner
mongolia nierji water project
|
2003
|
|
12
|
300 300t overhead crane
|
28
|
21
|
1
|
transformation
of wujiang guizhou hydropower station
|
2003
|
|
13
|
250 250/50/10t overhead crane
|
26/26/32
|
23.2
|
1
|
tai'an
shandong pumped storage power station
|
2003
|
|
14
|
400/100/10t overhead crane
|
27/35/48
|
20
|
2
|
hunan
three board creek hydropower station
|
2003
|
|
15
|
420/50/10t overhead crane
|
26.5/27.8
|
24
|
1
|
hengyang
hunan large terminal
|
2004
|
|
16
|
160t overhead crane
|
23/27/32
|
19.5
|
1
|
tibet
hydropower station
|
2004
|
|
17
|
260/90t overhead crane
|
24/27
|
23.5
|
2
|
sultan
merowe hydropower project
|
2005
|
|
18
|
350 350/50/15t
double trolley overhead crane
|
34/34/40
|
27
|
2
|
pengshui
chongqing power station
|
2005
|
|
19
|
160 160/40 40/10t
double trolley overhead crane
|
32/40/44
|
21
|
1
|
hunan
guayeshui water power station
|
2006
|
|
20
|
200 200/40t
double trolley overhead crane
|
42
|
20
|
1
|
yunnan
golan beach
|
2006
|
|
21
|
300 300/50/10t
double trolley overhead crane
|
35/35/43
|
19.5
|
1
|
guizhou
dongqing hydropower station
|
2008
|
|
22
|
300/50/10t double trolley overhead crane
|
26
|
24.5
|
2
|
sichuan
shawan hydropower station
|
2008
|
|
23
|
300 300/25 25/10t
double trolley overhead crane
|
64/60/67
|
28
|
1
|
guangxi
expansion project
|
2008
|
|
24
|
200/50/10t single trolley overhead crane
|
19/21/30
|
15.5
|
2
|
the
renovation project of hunan zhexi hydropower station
|
2009
|
|
25
|
180t/50t/2*10t-14.8
single trolley overhead crane
|
24/26/30
|
14.8
|
1
|
kampuchea
gan hydropower station
|
2009
|
|
26
|
400 400/160t
double trolley overhead crane
|
32
|
25.2
|
2
|
jinping
sichuan hydropower station
|
2010
|
|
27
|
200/50t 200/50t/10t
double trolley overhead crane
|
26/26/32
|
22.2
|
1
|
sichuan
mao er hydropower station
|
2010
|
|
28
|
125t/50t
single trolley electric overhead crane
|
44/47
|
17.5
|
1
|
laos
south russia 5 power station
|
2010
|
|
29
|
150/50/10t-14.0m,station is a3 type single hoist
bridge crane
|
25/30/30
|
14
|
1
|
guodian
xinjiang yili kashi river hydropower station, richter
|
2011
|
|
30
|
ship
room 125t/2*16t temporary overhead crane
|
35/35
|
24.2
|
1
|
yangtze
river three gorges project
|
2011
|
|
31
|
160t/50t/10t overhead crane
|
22/24
|
17.5
|
1
|
gabon
baja large hydropower project
|
2011
|
|
32
|
180/50/10t
single trolley electric overhead crane in power house
|
22/24/30
|
17
|
1
|
xinjiang
yili water power station tayi qurush
|
2011
|
|
33
|
250/63/2*10t single trolley electric
overhead crane in power house
|
30/30/36
|
20.5
|
1
|
xinjiang
kaidu liushugou hydropower station
|
2012
|
|
34
|
qe180 180/50 50/10t
power house overhead crane
|
30/40
|
21
|
1
|
buerjin
xinjiang mountain hydropower station
|
2012
|
|
35
|
motor room 63t/2*16t maintenance overhead
crane
|
12/157
|
18
|
2
|
yangtze
river three gorges project
|
2012
|
|
36
|
ship lift upper part gate 2*250t overhead
hoist
|
80
|
34
|
1
|
yangtze
river three gorges project
|
2013
|
|
37
|
ship lift upper part gate 2*250t overhead
hoist
|
72
|
34
|
1
|
yangtze
river three gorges project
|
2013
|
|
38
|
ship lift room 80t/2*16t overhead crane
|
160/16-42
|
42
|
1
|
xiangjiaba
hydropower station
|
2013
|
|
39
|
400 400/160t
double trolley overhead crane
|
53/36-26
|
26
|
1
|
engineering
angu hydropower station of dadu river
|
2013
|
|
40
|
125 125t
double trolley overhead crane
|
30/35-16.5
|
16.5
|
1
|
tibet
fruit and hydropower station
|
2014
|
|
41
|
200/50/10t mian power house electric double beam lifting overhead crane
|
35-20.5
|
20.5
|
1
|
congo
golden ii zongo hydropower station project
|
2014
|